Shopping Cart
0 item(s) - Rs. 0.00
MBA Project Reports, BBA Project Reports, Download MBA Project Reports, Projects Sample Topics
MBA projects, BBA project reports, MBA synopsis,Project proposal
| More

Finance at a Glance: Establishment and Cash at NTPC Kahalgaon

Rs. 1,000.00



Introduction:
India’s largest power company, NTPC was set up in 1975 to accelerate power development in India. NTPC is emerging as a diversified power major with presence in the entire value chain of the power generation business. Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilisation and coal mining. NTPC ranked 317th in the ‘2009, Forbes Global 2000’ ranking of the World’s biggest companies. NTPC became a Maharatna company in May, 2010, one of the only four companies to be awarded this status.
The total installed capacity of the company is 33,194 MW (including JVs) with 15 coal based and 7 gas based stations, located across the country. In addition under JVs, 5 stations are coal based & another station uses naptha/LNG as fuel. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources(RES) including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPC’s portfolio.
NTPC has been operating its plants at high efficiency levels. Although the company has 18.10% of the total national capacity, it contributes 28.60% of total power generation due to its focus on high efficiency.
In October 2004, NTPC launched its Initial Public Offering (IPO) consisting of 5.25% as fresh issue and 5.25% as offer for sale by Government of India. NTPC thus became a listed company in November 2004 with the Government holding 89.5% of the equity share capital. In February 2010, the Shareholding of Government of India was reduced from 89.5% to 84.5% through Further Public Offer. The rest is held by Institutional Investors and the Public.

Number of Pages of Project Report: 56
Package Includes: Project Report
Project Format: Document (.doc)

Table of Contents of Project Report:
1. Introduction
- Company Profile
- Vision
- Mission
- Core Values
- Milestones Expanding Excellence
2. Human Resource @ NTPC
3. The Project Kahalgaon
4. Salient Features
5. Department of Finance
6. SWOT of NTPC
7. Research Methodology
8. List of Manual
9. Finance & Establishment
10. Distribution of Hard Copy
11. Growth Plan
12. Power Plant Operation
13. Joint Venture Partners
14. Acquisition
15. Diversification
16. Participation by NTPC
17. Conclusion & Suggestions
18. Bibliography


About Us    Privacy Policy    Shipping/Cancellation/Refund Policy    Terms and Conditions    Site map

Copyright © 2017 ProjectFever.com - MBA project reports, BBA project reports, MBA synopsis, Project proposal, Download project reports, Projects sample, MBA project topics