Shopping Cart
0 item(s) - Rs. 0.00
MBA Project Reports, BBA Project Reports, Download MBA Project Reports, Projects Sample Topics
MBA projects, BBA project reports, MBA synopsis,Project proposal
| More

A Case Study of Dwell Time of Air Cargo Industry-Delhi Airport

Rs. 500.00



Introduction:
To find out the Actual Time Taken for Import and Export cargo Movement in the cargo terminal, this dwell time study was undertaken at Delhi Airport Cargo Terminal, New Delhi. It was also observed that certain factors such as installation of more counters and computer terminals, improvement in the seating arrangements and other amenities at the airport such as provision of A.C. facility in waiting hall, surprise checks by senior officials etc. have played an important role in curtailment of timings of consignment movements of both Import and Export cargo.
Import Cargo
To find out the actual time taken for import cargo movement in the cargo terminal, field work was conducted during 1st to 30th June, 2006 at Delhi Airport Cargo Terminal, New Delhi, to trace the movement of import cargo consignments and time taken for each activity. The actual time taken for the Import procedures through time and motion study for particular 15 consignments was found to be 2.3 days (54.4 hrs.).
Export Cargo
For the purpose of calculation of actual time taken for export cargo movement, field work was conducted during 1st to 30th June, 2006 at Delhi Airport Cargo Terminal, New Delhi, to trace the movement of export cargo consignments and time taken for each activity. The actual time taken for the Export procedures through time and motion study was found to be 1.3 days (28.9 hrs.).

Number of Pages of Project Report: 78
Package Includes: Project Report
Project Format: Document (.doc)

Table of Contents of Project Report:
1. Introduction
1.1 Twenty-First Century of Asia-Pacific
1.2 Current Scenario of India
1.3 Company Profile
2. Objective of the study
3. Importance of the Study
4. Research Methodology
5. Cargo Terminal – Delhi Airport
6. Cargo Revenue
7. Cargo Procedure – Delhi Airport
7.1 Steps Involved in the operating Procedures for Export Cargo Handling
7.1.1 Issuances of Terminal Charges Recipt
7.1.2 Truck Docking, Offloading and Examination of Cargo
7.1.3 Shifting of Cargo To Bonding Area
7.1.4 Palletisation of Packages at Build up Station
7.2 Steps Involved in Operating Procedures for Import Cargo Handling
7.2.1 Offloading of Cargo from the Aircraft (Airline Function)
7.2.2 Forwarding of Cargo for Customs Examination and Retrieval and Issuance of sample gate pass
7.2.3 Issuance of TSP Receipt (BC) and Collection of AAI Charges
7.2.4 Delivery of Cargo
8. Dwell Time of Air Cargo – Delhi Airport
8.1 Dwell Time of Import Cargo
8.2 Dwell Time of Export Cargo
9. Analysis
10. Limitation
11. Suggestion
Annexure
Definitions
Bibliography


About Us    Privacy Policy    Shipping/Cancellation/Refund Policy    Terms and Conditions    Site map

Copyright © 2024 ProjectFever.com - MBA project reports, BBA project reports, MBA synopsis, Project proposal, Download project reports, Projects sample, MBA project topics